Contact Us
  • 16000 W Michigan Ave. Albion,
    MI 49224
  • 517-343-1807
  • 8am – 6pm (EST) Mon-Fri

    To help us get you to the right expert, fill out the questionnaire below with the details you have.

    First Name*

    Last Name*

    Email*

    Phone*

     

    Company*

     

    How much weight are you trying to move?

     

    What type of load will the casters be moving (e.g., materials, equipment, products)?

     

    Are there any specific space constraints or limitations within your workspace that we should consider?

     

    How fast do you need to move the load?

     

    How far do you need to move the load?

     

    How often do you need to move the load per shift? Estimated usage per day?

     

    How many shifts per day?

     

    How would you like the cart to move (please select one option below)

     

    What kind of operator interface would you like?

     

    What is the ambient temperature in the areas where these machines are used?

     

    Do you have any specific safety requirements or regulations that the caster system needs to meet?

     

    Is there any kind of chemical or water exposure?

     

    What is the height from the floor to the bottom of the cart?

     

    Is it possible to change this height if needed to install the drive system?

     

    Are there any ramps or grades we need to negotiate?

     

    What is the expected lifespan of the caster system?

     

    How long has this been an issue?

     

    Is this the first attempt at fixing the issue? If not, what else have you tried?

     

    Have you had any injuries related to this issue?

     

    Have you worked out the budget for this project?

     

    Would you be able to share any pictures or CAD files with me to give me a better understanding of the situation?

     

    Are there any specific industry standards or certifications the caster system should comply with?

     

    What kind of lead time are you looking for?

     

    Is it possible to change this height if needed to install the drive system?

     

    Is there anything else you would like to share with me about the project?